as of the end of 2015, the company’s total installed capacity of thermal power is 10749mw, while the total installed capacity of new energy is 1561.5mw. (the capacity of wind power under operation is 1288.2mw, and the capacity of photovoltaic power under operation is 163.3mw)

according to the plan, the company’s total installed capacity of thermal power will be 12699 mw and the total installed capacity of new energy will be 2811.5 mw by the end of the thirteenth five-year plan.

  